1. That the CONTRACTOR agree to renovate and renovate ABC COFFEE SHOP at the price of the pesos contract: 000,000.00 (amount in words). 3. That the CONTRACTOR complete and surround the coffee in question at the contract price and in accordance with plans and specifications 9. That the withholding guarantee be released no later than two (2) weeks after the owner`s acceptance of the renovation carried out. 7. That the owner agree to pay 30% of the contract price at least 5 working days before the scheduled start date in the form of a down payment and the 70% balance payable in identical weekly payments based on the signing date until the expected end of the project. If necessary, additional costs must be borne as needed. 4. That the CONTRACTOR must pay a fine equal to 1% of the contract price for each day of turnover delay. Install the suspended system of ceiling beams as on the reflected plan In high-density polypropylene (PP-R) Water pipe pipes Use the plaster board as a ceiling, finished with a layer of sealing and followed by two semi-brilliant enamels with stippled finish Install 12mm thick tempered glass panels (exterior walls) with floor frame in accordance with the worktops on the signs 2, 3) Fabricate 3mm decoration of the metal frieze in the old version CET ACCORD, made this 8th day of January 2015, between SOUTHERN PHILIPPINES MEDICAL CENTER, with office address in Bajada, J.P. Laurel, Davao City (hereafter referred to as “ENTITY”) and RIEZL LANDCARE – CONSTRUCTION, with main address in Cor. Mamsa-Tulingan Street Brgy.

Wilfredo Aquino, Agdao District, Davao City (`CONTRACTOR`). (8) These 10% of payments to the CONTRACTOR are withheld by the owner as a guarantee of the completion of the work. paint, tiles and interior walls, as intended for surfaces, THE (name of contractor), major, single/married, resident (address), the following referred to as contractor and (owner`s name), major, single/married, resident (address) and later known as the owner, accept and declare: WHEREAS, all the work of this project, as covered by this contract, must be completed within 180 calendar days (hundred and eighty) in accordance with the provisions of the documents. Waterproof to all wetlands with Hygard, Thoroseal or authorized equivalent. Manufacturing and assembly of plywood counters with 12mm solid material. The Republic of the Philippines HEALTH HEALTH Center Davao Regionsouthern Philippines MEDICAL CENTERJ.P. Laurel Avenue. Davao City Install 12 x 12 Mariwasa ceramic floor tiles (Montalban Beige – Red). 5.

Work begins on January 1, 20. IN WITNESS, whose parties executed this agreement on the day and year before writing. Communicate the construction plan duly signed by a licensed health engineer 2. To ensure the necessary building permits, the CONTRACTOR is responsible for the purchase of equipment, recruitment, coordination with the architect and the owner with regard to the details of the construction and the approval of the materials.